Three. Soon after rig positioning, drive the casing into the ground. Travel steel casing into a least a depth of 1 m underneath the ground amount to choose lateral loads and actions at website. The steel casing also combat complications as a consequence of groundwater for the duration of piling. https://cast-in-situ-piles-in-dha33455.blogpostie.com/54195717/5-simple-techniques-for-cast-in-situ-piles